Création d’un duc d’Albe d’amarrage au poste 4 EN

PortdeCherbourg-Transmanche-Croisiere-DucdAlbeAmarrage
Port of Cherbourg ®Ports of Normandy
False
Erecting a set of mooring dolphins at station four

Brief overview

In order to be able to accommodate in optimal conditions 200 m and longer Ro-Ro vessels, Ports of Normandy will be adapting one of its mooring stations (station 4). The aim is to allow such vessels to maintain their position alongside in complete safety, including in unfavourable wind conditions. 

  

To achieve this, Ports of Normandy will be erecting a new set of mooring dolphins (piles driven into the seabed) situated 18 m to the west of the berthing wall. The mooring station will be equipped with a platform to allow the linesman to work safely. The platform will have one or two mooring hooks. Additionally, two new gangways will link the current turning station with this new mooring station. 

 

Useful information
Document(s)
Click to upload
Contact
Duc_Albe_Poste4_Budget

Budget

€2.1 M were allocated to the project, which was funded by:  

  • Normandy Region Council: €1.21 M
  • Manche Council: €0.63 M
  • Cotentin urban area: €0.21 M

 

Gallery
PortdeCherbourg-Transmanche-Croisiere-DucdAlbeAmarrage
®Ports de Normandie
PortdeCherbourg-Transmanche-Croisiere-PlanDucdAlbeAmarrage
®Ports de Normandie
PortdeCherbourg-Transmanche-Croisiere-DucdAlbeAmarrage
®Ports de Normandie
Poste 4 port de Cherbourg
©Jérôme Houyvet Biplan
Project schedule
Preparations
Last quarter 2023
Start date of works
1st quarter 2024
End date of works
2nd quarter 2024